The drilling will be conducted until the Maikop productive layer. The works will be carried out by SOCAR Complex Drilling Works Trust.
Saadan field is located on the territory of the Pre-Caspian-Guba oil and gas bearing region.
SOCAR is currently implementing a program to stabilize and increase oil production.
SOCAR extracted 1.25 million tons of oil from the country’s offshore and onshore fields in Jan.-Feb. 2016 as compared to 1.35 million tons extracted in the same period of 2015.
More about:






