The president was informed that 113-km long 12 water pipes were built and reconstructed here. A bridge was built in the road’s section in Tuntul village. Bus stations were built and traffic signs were installed along the road.
The highway, which links 3 residential areas in Gabala district with the total population of 7,000 people, provides access to the Garamaryam-Ismayilli-Shaki highway.
More about:






