"Twelve new road bridges were built and five roads were renovated. A new pedestrian crossing was buit on the section of Baku-Shamakhi highway, passing through the village of Jangi. Another crossing was repaired in Baku," read the message.
During the reporting period, 708,000 tons of asphalt, 40,400 tons of bitumen and 3,500 tons of fuel oil were used for construction and repair works.
More about:






