Transport Minister Ziya Mammadov informed the head of state of the technical indicators of the road. The link roads and the pedestrian underpass were constructed by Azvirt LLC.
The total length of the link roads is 6630 metres.
The head of state cut the ribbon symbolizing the opening of the new pedestrian underpass here.
President Ilham Aliyev was informed about the technical indicators of the underpass, which is 226 metres in length, 4 metres in height and 8 metres in width. It has four exits, and eight escalators.
More about: