Trans Adriatic Pipeline project 95.1% completed

  14 May 2020    Read: 1509
Trans Adriatic Pipeline project 95.1% completed

At the end of April 2020, the Trans Adriatic Pipeline (TAP) project was 95.1 percent completed, the TAP AG consortium reports.

“TAP is currently moving further into the project construction phase. Every day hundreds of meters of TAP’s Right of Way (ROW) are cleared, strung, welded, lowered into the trenches and backfilled, in line with the project construction steps and schedule. At the end of April 2020, the TAP project was 95.1 percent completed,” said the consortium.

TAP project, worth 4.5 billion euros, is one of the priority energy projects for the European Union (EU). The project envisages transportation of gas from Azerbaijan's Shah Deniz Stage 2 to the EU countries.

Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP will cross Northern Greece, Albania and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network.

The project is currently in its construction phase, which started in 2016.

TAP shareholders include BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent).


More about: TAP   Azerbaijan   Turkey   Greece   Albania  


News Line