The minister noted that Azerbaijan has managed to build a power station with a capacity of 20 MW in a short period of time. Moreover, 19 substations have been restored, seven substations have been constructed, while eight more substations are planned to be built.
“I'd like to note that Karabakh's solar energy potential is estimated at 7.2 GW, whereas its wind power potential – at 2 GW. Furthermore, 25 percent of the country's water resources are located in this region. Today, we'll sign documents with Masdar on the construction of the 4 MW substation and with bp – for 230 MW substation,” he added.
More about: Karabakh East-Zangazur