“The present document records political intent only. No provision of this Declaration shаll be interpreted and implemented as creating legal rights or commitments for the states of the parties,” the document reads.
The message said that Eastring gas pipeline project is the basis for this.
“Eastring is a proposed pipeline, a version of which is 832 kilometres long, and runs across Slovakia, Hungary and Romania, while another version is 1274 kilometres long, and reaches Bulgaria,” said the message. “One of its advantages is that Eastring uses the existing infrastructure of Eustream on Slovak territory, which was completely renovated after the 2009 gas crisis.”
“It is designed to transport gas in both directions, with a capacity of 20 billion cubic metres a year (bcm/y) at the first stage and 40 bcm/y at the final stage. Potential gas sources for forward flows are Azerbaijan, Turkmenistan, Iraq, Cyprus and Russia, while for the reverse flow, it is gas from Western European hubs,” said the message.
More about: