Accident at power plant in Armenia
As a result of the accident at the high-voltage power line energy supply of the substation and the first power unit of the Armenian nuclear power plant was interrupted on Jan. 21, she said. "As a result of the accident the third power unit was promptly loaded and shortage of power supply was compensated from Georgia".
The accident has been eliminated in the evening, adviser added.